Nail Down Engineered Hardwood Floor Installation
Solid hardwood flooring only can be installed on or above ground level with a plywood subfloor.
Nail down engineered hardwood floor installation. Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system. Nail down most common wood subfloor solid engineered floors only on grade or above grade less risk for sanding. The process involves nailing the flooring directly to a wood subfloor. Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
Nail installation is a method commonly used for solid hardwood floors. What s the best glue for your engineered wood flooring. Nailing down hardwood floors is the most common installation method especially for solid flooring. Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
It follows the same method as staple down installation but you use a wood flooring cleat rather than a stapler. Engineered floor guns nail or staple guns used for engineered floors will be 18 or 20 gauge based on the guns manufacturer. If you re installing engineered hardwood floors please refer to the staple down instructions. Epic plus engineered hardwood nailers staplers bostich ehf1838k 18 gauge x 1 4 crown x 1 long for planks under 5 wide 1 1 4 staple for planks 5 and wider.
When working on a clean concrete subfloor the glue down method is often the go to choice. Here s how to install flooring using the nail down method. Align the first board with the layout line with the tongue facing. Whatever glue product recommended by the manufacturer.
For engineered hardwood flooring match the ends and push into place. The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor. Get free shipping on qualified 3 8 in nail down engineered hardwood or buy online pick up in store today in the flooring department. Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
With a nail down engineered hardwood floor follow the same subfloor preparation steps as above including underlayment and laying spacers around the room s perimeter to maintain the manufacturer s recommended expansion gap.